Chrysotile Asbestos Mine (reference only; new leases not granted)
Not permitted in India (reference only) · Mining of asbestos
- Cost of project
- ₹ 1.02 crore
- Bank loan
- ₹ 76.53 lakh
- Own money
- ₹ 25.51 lakh
- Sales, year 1
- ₹ 2.27 crore
- Net profit, year 3
- ₹ 14.67 lakh
- Average DSCR
- 2.80
- Break-even, year 3
- 37%
- Jobs
- 13
About this business
Mining of chrysotile asbestos fibre for cement sheet makers. Shown only for reference: asbestos mining is not permitted for new projects in India.
How to make it, step by step
What you make or sell: Asbestos fibre, graded
- Drill and blast
- Crush ore
- Separate fibre under wet dust control
- Grade and bag
- Dispatch
Machines used: Hydraulic excavator (14 t class, used), Crusher and fibre separation unit, Dust extraction and wet suppression, Tractor with trailer
Licences and registrations you need
- Udyam registration (NIC 08995)
- GST registration
- Trade licence from the local body
- Not permitted: new asbestos mining leases are not granted in India
Machinery in this report
- Hydraulic excavator (14 t class, used)
- Crusher and fibre separation unit
- Dust extraction and wet suppression
- Tractor with trailer
Sellers for this business
PureFlux Engineering
Sewage treatment plants (STP, MBBR) · Effluent treatment plants (ETP) · RO plants · Zero liquid discharge (ZLD) plants
Recon Technologies Pvt Ltd
Hydraulic excavators (Tata Hitachi dealer) · Wheel loaders · Rock breakers and attachments · Used excavators
BB Engineering Works
Tractor trailer · Water tanker trailer
Infra Engineers
Slope vibratory compactors · Excavator attachments
Jaw Crusher India
Jaw crusher · Stone crusher · Vibrating screens · Conveyors
Shalimar Engineering
Jaw crusher · Crushing equipment · Screening equipment · Grinding equipment
Find suppliers:
Matching sellers send their quotations to your account. Compare them side by side and print the three that banks ask for with a loan file.
Want to start for less? Some of these machines may be available used: Resale Market · Post what you need
What is inside the full report
Bank DPR of about 24 pages, with your name filled in
- Project at a glance
- Business and product description
- Market and selling plan
- Process, step by step
- Licences and approvals
- Machinery list with prices
- Staff and wages
- Cost of project and means of finance
- Production and sales for 7 years
- Profit and loss, cash flow, balance sheet
- Loan repayment schedule
- DSCR, break-even and SWOT
- Site layout, utilities and raw material sources
- Sensitivity, risks, government schemes and bank document checklist
Project at a glance
Mining of chrysotile asbestos fibre for cement sheet makers. Shown only for reference: asbestos mining is not permitted for new projects in India.
| Name of the project | Chrysotile Asbestos Mine (reference only; new leases not granted) |
|---|---|
| Product / service | Asbestos fibre, graded |
| Installed capacity | 15 tonne per day, 280 days a year |
| Cost of project | ₹ 102.04 lakh |
| Term loan | ₹ 53.25 lakh |
| Working capital loan (cash credit) | ₹ 23.28 lakh |
| Promoter's contribution | ₹ 25.51 lakh (25%) |
| Sales: year 1 / year 3 | ₹ 226.80 / 262.00 lakh |
| Net profit: year 1 / year 3 | ₹ 5.19 / 14.67 lakh |
| Average DSCR (loan period) | 2.80 |
| Minimum DSCR | 1.47 |
| Break-even (year 3) | 37% of installed capacity |
| Payback period | 4.1 years |
| Project IRR (pre-finance) | 23.2% |
| Employment | 13 persons |
Schemes that may fit
- CGTMSE – Credit guarantee for collateral-free loansThe government guarantees your bank loan, so no collateral or third-party guarantee is needed.
- Udyam registration (free)The free MSME registration that unlocks most schemes, priority-sector loans and tender benefits.
- MSME ZED certificationQuality certification with most of the cost paid by the government.