Treated Wooden Sleeper and Timber Unit (railway and fencing supply)

Rural area near your city · Manufacture of wooden railway sleepers

Cost of project
₹ 55.11 lakh
Bank loan
₹ 47.28 lakh
Subsidy
₹ 9.92 lakh
Own money
₹ 7.83 lakh
Sales, year 1
₹ 98.01 lakh
Net profit, year 3
₹ 5.36 lakh
Average DSCR
2.87
Break-even, year 3
47%
Jobs
7

About this business

Saws, adzes, bores and pressure-treats hardwood into sleepers and crossing timbers for railway bridges and private sidings, and makes treated posts and fencing poles.

How to make it, step by step

What you make or sell: Treated hardwood sleepers and crossing timbers, Treated timber posts and fencing poles

  1. Buy hardwood logs from licensed depots
  2. Saw to size
  3. Adze and bore
  4. Pressure-treat with preservative
  5. Inspect, mark and dispatch

Machines used: Band saw with log carriage, Planer and adzing machine, Pressure treatment cylinder (CCA/ASCU) with pump, Drilling and boring jig, Chain pulley and forklift trolley

Run machines only with guards in place and trained operators, and keep a first-aid box and fire extinguisher in the unit.

Licences and registrations you need

  • Udyam registration (NIC 16103)
  • GST registration
  • Trade licence from the local body
  • Railway vendor registration (IREPS) and RDSO/inspection approval
  • Saw mill licence from the District Forest Officer
  • State Pollution Control Board consent (wood treatment chemicals)

Names of departments and Acts differ from state to state. Your District Industries Centre (DIC) can tell you the exact office in your state.

How to apply for Udyam, GST and other registrations ›
Made it? Now let us help you sell itOur digital marketing team makes your videos and posters, runs Meta and Google ads, and does SEO so the right buyers in your area find you first.

Machinery in this report

  • Band saw with log carriage
  • Planer and adzing machine
  • Pressure treatment cylinder (CCA/ASCU) with pump
  • Drilling and boring jig
  • Chain pulley and forklift trolley

Sellers for this business

Find suppliers:

Get quotations for these machines

Matching sellers send their quotations to your account. Compare them side by side and print the three that banks ask for with a loan file.

Want to start for less? Some of these machines may be available used: Resale Market · Post what you need

What is inside the full report

Bank DPR of about 24 pages, with your name filled in

  • Project at a glance
  • Business and product description
  • Market and selling plan
  • Process, step by step
  • Licences and approvals
  • Machinery list with prices
  • Staff and wages
  • Cost of project and means of finance
  • Production and sales for 7 years
  • Profit and loss, cash flow, balance sheet
  • Loan repayment schedule
  • DSCR, break-even and SWOT
  • Site layout, utilities and raw material sources
  • Sensitivity, risks, government schemes and bank document checklist

Project at a glance

Saws, adzes, bores and pressure-treats hardwood into sleepers and crossing timbers for railway bridges and private sidings, and makes treated posts and fencing poles.

Name of the projectTreated Wooden Sleeper and Timber Unit (railway and fencing supply)
Product / serviceTreated hardwood sleepers and crossing timbers, Treated timber posts and fencing poles
Installed capacity30 piece per day, 300 days a year
Cost of project₹ 55.11 lakh
Term loan (net of subsidy)₹ 11.50 lakh
Working capital loan (cash credit)₹ 25.86 lakh
PMEGP margin money (subsidy)₹ 9.92 lakh
Promoter's contribution₹ 7.83 lakh (14%)
Sales: year 1 / year 3₹ 98.01 / 111.54 lakh
Net profit: year 1 / year 3₹ 1.83 / 5.36 lakh
Average DSCR (loan period)2.87
Minimum DSCR2.14
Break-even (year 3)47% of installed capacity
Payback period6.0 years
Project IRR (pre-finance)16.1%
Employment7 persons
Viability checks passed: average DSCR 2.87, break-even below 70% of capacity, cash balance positive in every year, within the PMEGP project cost limit.