Low Carbon Ferro-Alloy Unit (aluminothermic, ferro-titanium and ferro-molybdenum)
Rural area near your city · Manufacture of ferro-alloys
- Cost of project
- ₹ 2.48 crore
- Bank loan
- ₹ 1.86 crore
- Own money
- ₹ 62.02 lakh
- Sales, year 1
- ₹ 8.64 crore
- Net profit, year 3
- ₹ 19.66 lakh
- Average DSCR
- 2.53
- Break-even, year 3
- 46%
- Jobs
- 13
About this business
Makes special low-carbon ferro-alloys such as ferro-titanium, ferro-molybdenum and ferro-vanadium for steel plants and foundries.
How to make it, step by step
What you make or sell: Ferro-titanium 70% (lumps), Ferro-molybdenum and ferro-vanadium (to order)
- Buy titanium scrap, oxides and aluminium powder
- Remelt or fire the thermit charge
- Cool and break the alloy
- Crush, screen and test
- Bag and dispatch
Machines used: Induction furnace 500 kg for remelting, Thermit reaction vessels and moulds, Crusher and screens, Spectrometer and lab, Weighbridge and hoist, Pollution control and dust collector
Licences and registrations you need
- Udyam registration (NIC 24104)
- GST registration
- Trade licence from the local body
- State Pollution Control Board consent to establish and operate
- Factory licence (State Factories Rules) when 10 or more workers with power
- EPF and ESI registration
- HT power connection from TNPDCL
- Fire safety NOC
- Explosives Rules licence from PESO for storing aluminium powder (if above limits)
Names of departments and Acts differ from state to state. Your District Industries Centre (DIC) can tell you the exact office in your state.
How to apply for Udyam, GST and other registrations ›Machinery in this report
- Induction furnace 500 kg for remelting
- Thermit reaction vessels and moulds
- Crusher and screens
- Spectrometer and lab
- Weighbridge and hoist
- Pollution control and dust collector
Sellers for this business
PureFlux Engineering
Sewage treatment plants (STP, MBBR) · Effluent treatment plants (ETP) · RO plants · Zero liquid discharge (ZLD) plants
Bhartia Engineering Industries
Stone crushing plants · Conveyors · Disintegrators · Crusher spares
C.P.C. Equipments (P) Ltd
Crushers · Vibrating screens · Conveyors · Feeders
Jaw Crusher India
Jaw crusher · Stone crusher · Vibrating screens · Conveyors
Shree Conmix Engineers Pvt Ltd
Jaw crusher · Cone crusher · Vertical shaft impactor · Mobile crushing plant
Conation Technologies Pvt. Ltd.
Abrasive cutting machine · Grinding and polishing machine · Industrial furnace · Metallurgical microscope
Find suppliers:
Matching sellers send their quotations to your account. Compare them side by side and print the three that banks ask for with a loan file.
Want to start for less? Some of these machines may be available used: Resale Market · Post what you need
What is inside the full report
Bank DPR of about 24 pages, with your name filled in
- Project at a glance
- Business and product description
- Market and selling plan
- Process, step by step
- Licences and approvals
- Machinery list with prices
- Staff and wages
- Cost of project and means of finance
- Production and sales for 7 years
- Profit and loss, cash flow, balance sheet
- Loan repayment schedule
- DSCR, break-even and SWOT
- Site layout, utilities and raw material sources
- Sensitivity, risks, government schemes and bank document checklist
Project at a glance
Makes special low-carbon ferro-alloys such as ferro-titanium, ferro-molybdenum and ferro-vanadium for steel plants and foundries.
| Name of the project | Low Carbon Ferro-Alloy Unit (aluminothermic, ferro-titanium and ferro-molybdenum) |
|---|---|
| Product / service | Ferro-titanium 70% (lumps), Ferro-molybdenum and ferro-vanadium (to order) |
| Installed capacity | 1 tonne per day, 300 days a year |
| Cost of project | ₹ 248.08 lakh |
| Term loan | ₹ 84.75 lakh |
| Working capital loan (cash credit) | ₹ 101.31 lakh |
| Promoter's contribution | ₹ 62.02 lakh (25%) |
| Sales: year 1 / year 3 | ₹ 864.00 / 1,099.94 lakh |
| Net profit: year 1 / year 3 | ₹ 0.60 / 19.66 lakh |
| Average DSCR (loan period) | 2.53 |
| Minimum DSCR | 1.52 |
| Break-even (year 3) | 46% of installed capacity |
| Payback period | 6.0 years |
| Project IRR (pre-finance) | 17.7% |
| Employment | 13 persons |
Schemes that may fit
- CGTMSE – Credit guarantee for collateral-free loansThe government guarantees your bank loan, so no collateral or third-party guarantee is needed.
- Udyam registration (free)The free MSME registration that unlocks most schemes, priority-sector loans and tender benefits.
- MSME ZED certificationQuality certification with most of the cost paid by the government.