Project reports › Metals and engineering

← All project reports

NIC 25133 Bank term loan (CGTMSE)

Boiler Economiser and Steam Accumulator Fabrication Unit

Rural area near your city · Manufacture of auxiliary plant for use with steam generators (condensers, economizers, superheaters, steam collectors and accumulators)

Cost of project
₹ 72.66 lakh
Bank loan
₹ 54.49 lakh
Own money
₹ 18.16 lakh
Sales, year 1
₹ 1.96 crore
Net profit, year 3
₹ 12.77 lakh
Average DSCR
2.86
Break-even, year 3
50%
Jobs
11

About this business

Makes economisers, air preheaters, steam headers, accumulators and condensate recovery units that add on to existing boilers.

How to make it, step by step

What you make or sell: Economisers and air preheaters, Steam accumulators, headers and condensate recovery units

  1. Take boiler data and design
  2. Bend and weld tubes
  3. Make headers and shell
  4. Hydraulic test under IBR
  5. Supply and erect at site

Machines used: Plate rolling machine, Tube bending machine, TIG and MIG welding machines, EOT crane 5 tonne, Radial drill and lathe, Hydraulic test and NDT tools

Run machines only with guards in place and trained operators, and keep a first-aid box and fire extinguisher in the unit.

Licences and registrations you need

  • Udyam registration (NIC 25133)
  • GST registration
  • Trade licence from the local body
  • Recognition as a boiler manufacturer under the Indian Boiler Regulations (Boilers Act) and stage inspection by the Directorate of Boilers of your state
  • State Pollution Control Board consent to establish and operate
  • EPF and ESI registration

Names of departments and Acts differ from state to state. Your District Industries Centre (DIC) can tell you the exact office in your state.

How to apply for Udyam, GST and other registrations ›
Made it? Now let us help you sell itOur digital marketing team makes your videos and posters, runs Meta and Google ads, and does SEO so the right buyers in your area find you first.

Machinery in this report

  • Plate rolling machine
  • Tube bending machine
  • TIG and MIG welding machines
  • EOT crane 5 tonne
  • Radial drill and lathe
  • Hydraulic test and NDT tools

Sellers for this business

Find suppliers:

Get quotations for these machines

Matching sellers send their quotations to your account. Compare them side by side and print the three that banks ask for with a loan file.

Want to start for less? Some of these machines may be available used: Resale Market · Post what you need

What is inside the full report

Bank DPR of about 24 pages, with your name filled in

  • Project at a glance
  • Business and product description
  • Market and selling plan
  • Process, step by step
  • Licences and approvals
  • Machinery list with prices
  • Staff and wages
  • Cost of project and means of finance
  • Production and sales for 7 years
  • Profit and loss, cash flow, balance sheet
  • Loan repayment schedule
  • DSCR, break-even and SWOT
  • Site layout, utilities and raw material sources
  • Sensitivity, risks, government schemes and bank document checklist

Project at a glance

Makes economisers, air preheaters, steam headers, accumulators and condensate recovery units that add on to existing boilers.

Name of the projectBoiler Economiser and Steam Accumulator Fabrication Unit
Product / serviceEconomisers and air preheaters, Steam accumulators, headers and condensate recovery units
Installed capacity0 unit per day, 300 days a year
Cost of project₹ 72.66 lakh
Term loan₹ 23.62 lakh
Working capital loan (cash credit)₹ 30.87 lakh
Promoter's contribution₹ 18.16 lakh (25%)
Sales: year 1 / year 3₹ 196.02 / 245.77 lakh
Net profit: year 1 / year 3₹ 2.51 / 12.77 lakh
Average DSCR (loan period)2.86
Minimum DSCR1.92
Break-even (year 3)50% of installed capacity
Payback period4.4 years
Project IRR (pre-finance)25.7%
Employment11 persons
Viability checks passed: average DSCR 2.86, break-even below 70% of capacity, cash balance positive in every year.