FTTH Fibre Drop Cable and Patch Cord Unit
Rural area near your city · Manufacture of fibre optic cables for data transmission or live transmission of images
- Cost of project
- ₹ 1.43 crore
- Bank loan
- ₹ 1.07 crore
- Own money
- ₹ 35.70 lakh
- Sales, year 1
- ₹ 2.90 crore
- Net profit, year 3
- ₹ 19.61 lakh
- Average DSCR
- 2.88
- Break-even, year 3
- 42%
- Jobs
- 11
About this business
Sheaths optical fibre into FTTH drop cables for home internet connections and makes patch cords and pigtails.
How to make it, step by step
What you make or sell: FTTH drop cable (1 and 2 fibre), Patch cords and pigtails (per km equivalent)
- Pay off fibre and steel strength members
- Extrude LSZH sheath
- Cool and wind on drums
- Test with OTDR
- Make patch cords, pack and dispatch
Machines used: Drop cable sheathing line (LSZH extrusion), Fibre pay-off and take-up units, OTDR and optical power testing, Patch cord polishing and connector tools, Insertion and return loss tester, Chiller and compressor
Licences and registrations you need
- Udyam registration (NIC 27310)
- GST registration
- Trade licence from the local body
- TEC certification (GR) for supply to telecom operators
- BIS registration where required
- State Pollution Control Board consent to establish and operate
- Fire safety NOC
- EPF and ESI registration
Names of departments and Acts differ from state to state. Your District Industries Centre (DIC) can tell you the exact office in your state.
How to apply for Udyam, GST and other registrations ›Machinery in this report
- Drop cable sheathing line (LSZH extrusion)
- Fibre pay-off and take-up units
- OTDR and optical power testing
- Patch cord polishing and connector tools
- Insertion and return loss tester
- Chiller and compressor
Sellers for this business
Sparkle Airpower Solutions
Air compressors · Air dryers · Line filters · Compressed air accessories
Aadi Corporation
Air compressors · Air dryers · Line filters · Compressed air accessories
Aditi Engineering Corporation
Air compressors · Air dryers · Line filters · Compressed air accessories
Air Solve
Air compressors · Air dryers · Line filters · Compressed air accessories
Airchem Solutions
Air compressors · Air dryers · Line filters · Compressed air accessories
Airkom Agencies
Air compressors · Air dryers · Line filters · Compressed air accessories
Find suppliers:
Matching sellers send their quotations to your account. Compare them side by side and print the three that banks ask for with a loan file.
Want to start for less? Some of these machines may be available used: Resale Market · Post what you need
What is inside the full report
Bank DPR of about 24 pages, with your name filled in
- Project at a glance
- Business and product description
- Market and selling plan
- Process, step by step
- Licences and approvals
- Machinery list with prices
- Staff and wages
- Cost of project and means of finance
- Production and sales for 7 years
- Profit and loss, cash flow, balance sheet
- Loan repayment schedule
- DSCR, break-even and SWOT
- Site layout, utilities and raw material sources
- Sensitivity, risks, government schemes and bank document checklist
Project at a glance
Sheaths optical fibre into FTTH drop cables for home internet connections and makes patch cords and pigtails.
| Name of the project | FTTH Fibre Drop Cable and Patch Cord Unit |
|---|---|
| Product / service | FTTH drop cable (1 and 2 fibre), Patch cords and pigtails (per km equivalent) |
| Installed capacity | 50 km per day, 300 days a year |
| Cost of project | ₹ 142.79 lakh |
| Term loan | ₹ 64.12 lakh |
| Working capital loan (cash credit) | ₹ 42.97 lakh |
| Promoter's contribution | ₹ 35.70 lakh (25%) |
| Sales: year 1 / year 3 | ₹ 289.88 / 356.73 lakh |
| Net profit: year 1 / year 3 | ₹ 5.82 / 19.61 lakh |
| Average DSCR (loan period) | 2.88 |
| Minimum DSCR | 1.77 |
| Break-even (year 3) | 42% of installed capacity |
| Payback period | 4.4 years |
| Project IRR (pre-finance) | 23.3% |
| Employment | 11 persons |
Schemes that may fit
- CGTMSE – Credit guarantee for collateral-free loansThe government guarantees your bank loan, so no collateral or third-party guarantee is needed.
- Udyam registration (free)The free MSME registration that unlocks most schemes, priority-sector loans and tender benefits.
- MSME ZED certificationQuality certification with most of the cost paid by the government.

