Home UPS and Inverter Assembly Unit
your city (urban) · Manufacture of other electrical equipment
- Cost of project
- ₹ 24.85 lakh
- Bank loan
- ₹ 20.81 lakh
- Subsidy
- ₹ 2.17 lakh
- Own money
- ₹ 4.04 lakh
- Sales, year 1
- ₹ 1.06 crore
- Net profit, year 3
- ₹ 7.93 lakh
- Average DSCR
- 6.29
- Break-even, year 3
- 35%
- Jobs
- 7
About this business
Assembles sine wave home UPS units and solar inverters with in-house wound transformers, under its own brand.
How to make it, step by step
What you make or sell: Sine wave home UPS 900 VA, Solar inverter 1.5 to 3 kVA
- Wind transformers
- Assemble control boards
- Fit into cabinets
- Load and burn-in test
- Pack and dispatch
Machines used: Transformer winding machine, Soldering and rework stations, Load bank and burn-in rack, Sheet metal cabinet tools, Test instruments (oscilloscope, meters)
Licences and registrations you need
- Udyam registration (NIC 27900)
- GST registration
- Trade licence from the local body
- BIS registration under the Compulsory Registration Scheme (IS 16242) for UPS and inverters
- EPR registration under the E-Waste (Management) Rules with CPCB
Machinery in this report
- Transformer winding machine
- Soldering and rework stations
- Load bank and burn-in rack
- Sheet metal cabinet tools
- Test instruments (oscilloscope, meters)
Sellers for this business
Madhu Group (Conquerent Control Systems)
LT control panels · MV panels · Transformers · Compact package substations
Mickey Metal Industries
Distribution transformer repair
Aarnav Powertech
Transformers · Distribution transformers
Aatiq Power Solutions India Pvt. Ltd.
Constant voltage transformer · Online UPS · Isolation transformer · Voltage stabilizer
Alco Electrostrips Pvt. Ltd.
Paper-covered aluminium strips · Copper strips and wires for transformers
Beta Power Controls LLP
Variable auto transformers · Servo stabilisers
Find suppliers:
Matching sellers send their quotations to your account. Compare them side by side and print the three that banks ask for with a loan file.
Want to start for less? Some of these machines may be available used: Resale Market · Post what you need
What is inside the full report
Bank DPR of about 24 pages, with your name filled in
- Project at a glance
- Business and product description
- Market and selling plan
- Process, step by step
- Licences and approvals
- Machinery list with prices
- Staff and wages
- Cost of project and means of finance
- Production and sales for 7 years
- Profit and loss, cash flow, balance sheet
- Loan repayment schedule
- DSCR, break-even and SWOT
- Site layout, utilities and raw material sources
- Sensitivity, risks, government schemes and bank document checklist
Project at a glance
Assembles sine wave home UPS units and solar inverters with in-house wound transformers, under its own brand.
| Name of the project | Home UPS and Inverter Assembly Unit |
|---|---|
| Product / service | Sine wave home UPS 900 VA, Solar inverter 1.5 to 3 kVA |
| Installed capacity | 12 unit per day, 300 days a year |
| Cost of project | ₹ 24.85 lakh |
| Term loan (net of subsidy) | ₹ 5.66 lakh |
| Working capital loan (cash credit) | ₹ 12.98 lakh |
| PMEGP margin money (subsidy) | ₹ 2.17 lakh |
| Promoter's contribution | ₹ 4.04 lakh (16%) |
| Sales: year 1 / year 3 | ₹ 106.13 / 140.74 lakh |
| Net profit: year 1 / year 3 | ₹ 2.01 / 7.93 lakh |
| Average DSCR (loan period) | 6.29 |
| Minimum DSCR | 3.24 |
| Break-even (year 3) | 35% of installed capacity |
| Payback period | 3.4 years |
| Project IRR (pre-finance) | 37.1% |
| Employment | 7 persons |
Schemes that may fit
- PMEGP – Prime Minister's Employment Generation ProgrammeSubsidy of 15% to 35% on a bank loan for a new unit.
- CGTMSE – Credit guarantee for collateral-free loansThe government guarantees your bank loan, so no collateral or third-party guarantee is needed.
- Stand-Up IndiaBank loans of ₹10 lakh to ₹1 crore for SC/ST and women entrepreneurs.
- Udyam registration (free)The free MSME registration that unlocks most schemes, priority-sector loans and tender benefits.
- MSME ZED certificationQuality certification with most of the cost paid by the government.