Indian-built. Indian-owned. For India's growth.
Suppliers, tenders and schemes from your state show first.
Project reports › Vehicles and transport

← All project reports

NIC 30202 Bank term loan (CGTMSE)

Railway and Metro Coach Interior Fittings Unit (luggage racks, panels, berth parts)

your city (urban) · Manufacture of self-propelled railway or tramway coaches, vans and trucks, maintenance or service vehicles

Cost of project
₹ 1.25 crore
Bank loan
₹ 94.01 lakh
Own money
₹ 31.34 lakh
Sales, year 1
₹ 2.70 crore
Net profit, year 3
₹ 12.50 lakh
Average DSCR
2.88
Break-even, year 3
26%
Jobs
16

About this business

Makes aluminium luggage racks, grab rails, interior panels and berth fittings for railway, Vande Bharat and metro coaches to ICF drawings.

How to make it, step by step

What you make or sell: Aluminium luggage racks and grab rails, FRP and aluminium interior panels and berth fittings

  1. Get drawing and approval
  2. Cut and punch aluminium profiles
  3. Weld, bend and finish
  4. Make FRP panels
  5. Inspect and supply in sets

Machines used: Aluminium profile cutting and CNC punching, TIG welding sets, Bending machine, FRP moulds, Powder coating and anodising tie-up tools, Testing and gauges

Run machines only with guards in place and trained operators, and keep a first-aid box and fire extinguisher in the unit.

Licences and registrations you need

  • Udyam registration (NIC 30202)
  • GST registration
  • Trade licence from the local body
  • RDSO / Indian Railways vendor registration (Part II, then Part I) and registration on the IREPS and GeM portals
  • ICF vendor approval
  • ISO 9001 certification
  • Factories Act licence
How to apply for Udyam, GST and other registrations ›
Made it? Now let us help you sell itOur digital marketing team makes your videos and posters, runs Meta and Google ads, and does SEO so the right buyers in your area find you first.

Machinery in this report

  • Aluminium profile cutting and CNC punching
  • TIG welding sets
  • Bending machine
  • FRP moulds
  • Powder coating and anodising tie-up tools
  • Testing and gauges

Sellers for this business

Find suppliers:

Get quotations for these machines

Matching sellers send their quotations to your account. Compare them side by side and print the three that banks ask for with a loan file.

Want to start for less? Some of these machines may be available used: Resale Market · Post what you need

What is inside the full report

Bank DPR of about 24 pages, with your name filled in

  • Project at a glance
  • Business and product description
  • Market and selling plan
  • Process, step by step
  • Licences and approvals
  • Machinery list with prices
  • Staff and wages
  • Cost of project and means of finance
  • Production and sales for 7 years
  • Profit and loss, cash flow, balance sheet
  • Loan repayment schedule
  • DSCR, break-even and SWOT
  • Site layout, utilities and raw material sources
  • Sensitivity, risks, government schemes and bank document checklist

Project at a glance

Makes aluminium luggage racks, grab rails, interior panels and berth fittings for railway, Vande Bharat and metro coaches to ICF drawings.

Name of the projectRailway and Metro Coach Interior Fittings Unit (luggage racks, panels, berth parts)
Product / serviceAluminium luggage racks and grab rails, FRP and aluminium interior panels and berth fittings
Installed capacity40 set per day, 300 days a year
Cost of project₹ 125.35 lakh
Term loan₹ 40.73 lakh
Working capital loan (cash credit)₹ 53.28 lakh
Promoter's contribution₹ 31.34 lakh (25%)
Sales: year 1 / year 3₹ 270.00 / 305.54 lakh
Net profit: year 1 / year 3₹ 4.53 / 12.50 lakh
Average DSCR (loan period)2.88
Minimum DSCR1.99
Break-even (year 3)26% of installed capacity
Payback period5.7 years
Project IRR (pre-finance)17.2%
Employment16 persons
Viability checks passed: average DSCR 2.88, break-even below 70% of capacity, cash balance positive in every year.

Schemes that may fit

Next →Railway Composite Brake Block Unit

More Vehicles and transport project reports

← All project reportsHome