Indian-built. Indian-owned. For India's growth.
Suppliers, tenders and schemes from your state show first.
Project reports › Construction

← All project reports

NIC 42102 Bank term loan (CGTMSE)

Railway Track Maintenance Sub-contractor

your city (urban) · Construction and maintenance of railways and rail-bridges

Cost of project
₹ 57.49 lakh
Bank loan
₹ 43.12 lakh
Own money
₹ 14.37 lakh
Sales, year 1
₹ 1.18 crore
Net profit, year 3
₹ 8.48 lakh
Average DSCR
2.86
Break-even, year 3
36%
Jobs
7

About this business

Does railway track maintenance and renewal work: sleeper and rail replacement, ballast work, rail welding and boxing, as a sub-contractor.

How the service is done, step by step

What you make or sell: Track renewal and sleeper replacement (labour and tools), Ballast cleaning, welding and boxing

  1. Get work order and block timings
  2. Mobilise gang and machines
  3. Do track work during traffic blocks
  4. Get inspection by railway engineers
  5. Measure and bill

Machines used: Rail cutting and drilling machines, Small track tampers, Rail welding kit (AT welding), Hydraulic jacks, tools and safety gear, Used pickup vehicle, Generator sets

Licences and registrations you need

  • Udyam registration (NIC 42102)
  • GST registration
  • Trade licence from the local body
  • Registration on IREPS e-tender portal
  • Labour licence under the Contract Labour Act
  • EPF and ESI registration
  • Railway safety competency certificates for supervisors
How to apply for Udyam, GST and other registrations ›
Made it? Now let us help you sell itOur digital marketing team makes your videos and posters, runs Meta and Google ads, and does SEO so the right buyers in your area find you first.

Machinery in this report

  • Rail cutting and drilling machines
  • Small track tampers
  • Rail welding kit (AT welding)
  • Hydraulic jacks, tools and safety gear
  • Used pickup vehicle
  • Generator sets

Sellers for this business

Find suppliers:

Get quotations for these machines

Matching sellers send their quotations to your account. Compare them side by side and print the three that banks ask for with a loan file.

Want to start for less? Some of these machines may be available used: Resale Market · Post what you need

What is inside the full report

Bank DPR of about 24 pages, with your name filled in

  • Project at a glance
  • Business and product description
  • Market and selling plan
  • Process, step by step
  • Licences and approvals
  • Machinery list with prices
  • Staff and wages
  • Cost of project and means of finance
  • Production and sales for 7 years
  • Profit and loss, cash flow, balance sheet
  • Loan repayment schedule
  • DSCR, break-even and SWOT
  • Site layout, utilities and raw material sources
  • Sensitivity, risks, government schemes and bank document checklist

Project at a glance

Does railway track maintenance and renewal work: sleeper and rail replacement, ballast work, rail welding and boxing, as a sub-contractor.

Name of the projectRailway Track Maintenance Sub-contractor
Product / serviceTrack renewal and sleeper replacement (labour and tools), Ballast cleaning, welding and boxing
Installed capacity70 track metre per day, 280 days a year
Cost of project₹ 57.49 lakh
Term loan₹ 28.88 lakh
Working capital loan (cash credit)₹ 14.24 lakh
Promoter's contribution₹ 14.37 lakh (25%)
Sales: year 1 / year 3₹ 118.19 / 130.96 lakh
Net profit: year 1 / year 3₹ 3.54 / 8.48 lakh
Average DSCR (loan period)2.86
Minimum DSCR1.52
Break-even (year 3)36% of installed capacity
Payback period4.1 years
Project IRR (pre-finance)22.8%
Employment7 persons
Viability checks passed: average DSCR 2.86, break-even below 70% of capacity, cash balance positive in every year.

Schemes that may fit

Next →RCC Pipe Unit

More Construction project reports

← All project reportsHome