20-Bed General Hospital (leased building)
your city (urban) · Hospital activities
- Cost of project
- ₹ 1.70 crore
- Bank loan
- ₹ 1.28 crore
- Own money
- ₹ 42.52 lakh
- Sales, year 1
- ₹ 3.42 crore
- Net profit, year 3
- ₹ 31.26 lakh
- Average DSCR
- 2.97
- Break-even, year 3
- 56%
- Jobs
- 33
About this business
A 20-bed general hospital with OPD, emergency, operation theatre, labour room, ICU, lab, X-ray and pharmacy, run by a doctor-promoter with visiting specialists.
How the service is done, step by step
What you make or sell: Inpatient care, surgery and ICU (per bed-day), OPD, lab, X-ray and pharmacy (per bed-day equivalent)
- Register the patient at OPD or emergency
- Examine and run tests
- Admit, treat or operate
- Monitor in ward or ICU
- Discharge, bill and follow up
Machines used: Operation theatre (table, lights, anaesthesia workstation), ICU beds, monitors and ventilators, X-ray, ultrasound and ECG, Lab analysers, Ward beds, furniture and fit-out, Generator, oxygen manifold and UPS
Licences and registrations you need
- Udyam registration (NIC 86100)
- Trade licence from the local body
- Registration under the State Clinical Establishments (Regulation and Registration) Act
- State Pollution Control Board authorisation under the Bio-Medical Waste Management Rules and tie-up with a common BMW treatment facility
- Fire safety NOC
- Drug licence for the pharmacy
- AERB licence for X-ray
- PCPNDT registration for ultrasound
- Empanelment with CMCHIS and insurers
Names of departments and Acts differ from state to state. Your District Industries Centre (DIC) can tell you the exact office in your state.
How to apply for Udyam, GST and other registrations ›Machinery in this report
- Operation theatre (table, lights, anaesthesia workstation)
- ICU beds, monitors and ventilators
- X-ray, ultrasound and ECG
- Lab analysers
- Ward beds, furniture and fit-out
- Generator, oxygen manifold and UPS
Sellers for this business
Diesel Power International
Diesel generator sets · Alternators (Kirloskar Electric dealer) · Generator service
Ghatge Karkera Power Industries
Diesel generator sets · Acoustic enclosures
Green Power Generators (P) Ltd
Diesel generator sets · Alternators (Kirloskar Electric dealer) · Generator service
Hira Silent Generators
Diesel generator sets · Silent generators · Alternators (Kirloskar Electric dealer)
Power Engineering (India) Pvt Ltd
Diesel generator sets · DG sets
Pulimoottil Lights And Pumps
Taro pumps (authorised dealer) · Submersible pumps · Monoblock pumps · Borewell pumps
Find suppliers:
Matching sellers send their quotations to your account. Compare them side by side and print the three that banks ask for with a loan file.
Want to start for less? Some of these machines may be available used: Resale Market · Post what you need
What is inside the full report
Bank DPR of about 24 pages, with your name filled in
- Project at a glance
- Business and product description
- Market and selling plan
- Process, step by step
- Licences and approvals
- Machinery list with prices
- Staff and wages
- Cost of project and means of finance
- Production and sales for 7 years
- Profit and loss, cash flow, balance sheet
- Loan repayment schedule
- DSCR, break-even and SWOT
- Site layout, utilities and raw material sources
- Sensitivity, risks, government schemes and bank document checklist
Project at a glance
A 20-bed general hospital with OPD, emergency, operation theatre, labour room, ICU, lab, X-ray and pharmacy, run by a doctor-promoter with visiting specialists.
| Name of the project | 20-Bed General Hospital (leased building) |
|---|---|
| Product / service | Inpatient care, surgery and ICU (per bed-day), OPD, lab, X-ray and pharmacy (per bed-day equivalent) |
| Installed capacity | 20 bed-day per day, 365 days a year |
| Cost of project | ₹ 170.08 lakh |
| Term loan | ₹ 106.50 lakh |
| Working capital loan (cash credit) | ₹ 21.06 lakh |
| Promoter's contribution | ₹ 42.52 lakh (25%) |
| Sales: year 1 / year 3 | ₹ 341.64 / 422.85 lakh |
| Net profit: year 1 / year 3 | ₹ 1.80 / 31.26 lakh |
| Average DSCR (loan period) | 2.97 |
| Minimum DSCR | 1.66 |
| Break-even (year 3) | 56% of installed capacity |
| Payback period | 3.5 years |
| Project IRR (pre-finance) | 29.7% |
| Employment | 33 persons |
Schemes that may fit
- CGTMSE – Credit guarantee for collateral-free loansThe government guarantees your bank loan, so no collateral or third-party guarantee is needed.
- Udyam registration (free)The free MSME registration that unlocks most schemes, priority-sector loans and tender benefits.
- MSME ZED certificationQuality certification with most of the cost paid by the government.

