NIC 07100 Bank term loan (CGTMSE)

Iron Ore Fines Screening and Magnetic Beneficiation Unit

Ballari, Karnataka (rural) · Mining of iron ores

Cost of project
₹ 2.58 crore
Bank loan
₹ 1.94 crore
Own money
₹ 64.61 lakh
Sales, year 1
₹ 5.91 crore
Net profit, year 3
₹ 30.62 lakh
Average DSCR
1.71
Break-even, year 3
46%
Jobs
17

About this business

Buys low-grade iron ore fines, crushes, screens and runs them through magnetic separators to make 62-63% Fe concentrate and sized lump ore.

How to make it, step by step

What you make or sell: Iron ore concentrate, 62-63% Fe, Sized lump ore, 10-40 mm

  1. Buy fines in the e-auction
  2. Crush and screen
  3. Dry magnetic separation
  4. Stack concentrate and test Fe
  5. Weigh and dispatch with permits

Machines used: Jaw and cone crusher set, Vibrating screens, Dry magnetic drum separators, Belt conveyors, Wheel loader, Weighbridge, 60 tonne

Run machines only with guards in place and trained operators, and keep a first-aid box and fire extinguisher in the unit.

Licences and registrations you need

  • Udyam registration (NIC 07100)
  • GST registration
  • Trade licence from the local body
  • Registration as mineral dealer / processing unit with the state Dept of Mines and Geology
  • Indian Bureau of Mines registration (end user / trader)
  • State Pollution Control Board consent
  • Mineral transport permits
How to apply for Udyam, GST and other registrations ›
Made it? Now let us help you sell itOur digital marketing team makes your videos and posters, runs Meta and Google ads, and does SEO so the right buyers in your area find you first.

Machinery in this report

  • Jaw and cone crusher set
  • Vibrating screens
  • Dry magnetic drum separators
  • Belt conveyors
  • Wheel loader
  • Weighbridge, 60 tonne

Sellers for this business

Find suppliers:

Get quotations for these machines

Matching sellers send their quotations to your account. Compare them side by side and print the three that banks ask for with a loan file.

Want to start for less? Some of these machines may be available used: Resale Market · Post what you need

What is inside the full report

Bank DPR of about 24 pages, with your name filled in

  • Project at a glance
  • Business and product description
  • Market and selling plan
  • Process, step by step
  • Licences and approvals
  • Machinery list with prices
  • Staff and wages
  • Cost of project and means of finance
  • Production and sales for 7 years
  • Profit and loss, cash flow, balance sheet
  • Loan repayment schedule
  • DSCR, break-even and SWOT
  • Site layout, utilities and raw material sources
  • Sensitivity, risks, government schemes and bank document checklist

Project at a glance

Buys low-grade iron ore fines, crushes, screens and runs them through magnetic separators to make 62-63% Fe concentrate and sized lump ore.

Name of the projectIron Ore Fines Screening and Magnetic Beneficiation Unit
Product / serviceIron ore concentrate, 62-63% Fe, Sized lump ore, 10-40 mm
Installed capacity80 tonne per day, 300 days a year
Cost of project₹ 258.42 lakh
Term loan₹ 128.25 lakh
Working capital loan (cash credit)₹ 65.57 lakh
Promoter's contribution₹ 64.61 lakh (25%)
Sales: year 1 / year 3₹ 591.36 / 741.44 lakh
Net profit: year 1 / year 3₹ 5.58 / 30.62 lakh
Average DSCR (loan period)1.71
Minimum DSCR1.31
Break-even (year 3)46% of installed capacity
Payback period4.6 years
Project IRR (pre-finance)21.4%
Employment17 persons
Viability checks passed: average DSCR 1.71, break-even below 70% of capacity, cash balance positive in every year.

Schemes that may fit

Next →Laterite Building Block Quarry

More Mining and minerals project reports

← All project reportsHome